What is Moon Lifter?
What is a balancer? What is Moon Lifter?
We will introduce what Moon Lifter can do comprehensibly.
Exceeded 6000 units
in cumulative sales!

A balancer is an assistive device used for handling heavy objects.
It reduces the strain on your hands when handling a workpiece.
Moon Lifter is an electric balancer
equipped with Unipulse's unique
sensing technologies. It controls a workpiece
weight so that it feels as though it is 0 kg.
Moon Lifter allows you to handle heavy objects with the same ease as lifting a smartphone.
Handling heavy objects, which is often associated with danger, can be done safely. Thanks to its excellent workability, anyone can use it effortlessly.

What would you ask for
a future assisting device?
We want to work safely and maintain good health.
Want to enhance the product quality.
(Want to avoid scratches or damages on products.)
Want to shorten takt time.
Moon Lifter will solve them all!
We want to work safely and maintain good health.
Significantly reduce the risks of injuries or the strains on the body
Moon Lifter allows us to handle suspended workpieces as though they have no weight at all.
It significantly reduces the risks of injuries or the strains on the body due to handling heavy objects.
Enables bimanual operation
During operation, you can hold the workpiece with both hands and handle it in a stable, well-balanced posture.
Emergency safety features
-
Overload
Moon Lifter continuously detects the applied force and never generate force beyond the specified load.
-
Falling
Moon Lifter locks automatically if the hook is pulled suddenly.
-
Buck-jumping
Moon Lifter will not jump back even if the hook is released unexpectedly.
-
Blackout
The auto-brake mechanism prevents the workpiece from dropping.
Want to enhance the product quality.
(Want to avoid scratches or damages on products.)
Achieves millimeter-level positioning accuracy
The workpiece can be held with both hands and positioned exactly where it is supposed to be.
Set & control the movable range
● Will not let the workpiece grounded.
● Such as "descending slowly until grounding is detected", setting and controlling of the movable range is possible.
Want to shorten takt time.
No inching operations are needed
No complicated button operations are required, allowing anyone to operate it right away.
It's okay even if the workpiece changes
Even the workpieces with different weights or shapes can be handled with the same operation.

features
Inertia Canceler
Energy-saving & Eco-friendly
Compact & Lightweight
Inertia Canceler
Normally, you need to apply force in the opposite direction to stop a workpiece that has gained momentum.
With Moon Lifter’s “Inertia Canceler,” no additional stopping force is required.
The workpiece stops right away when your hands are off.
Energy-saving & Eco-friendly
When Moon Lifter is not in use, it automatically switches to power-saving mode.
Because it is electrically driven, it is energy-efficient and eco-friendly
In case of ML-60K
-
When in
60kg balance
-
When in
20kg balance
-
When not
in use
-
When in power-saving mode

Compact & Lightweight
The lightweight model weighs only 9 kg!
Moon Lifter is not only easy to install, its lateral movements and initial handling feel light and effortless. In addition, its compact body allows installation even in areas with low ceilings.
A more pleasant and comfortable work environment for everyone, even senior and female workers
Due to growing consciousness of corporate compliance, it is required to create a comfortable working environment for even senior and female workers.
Handling or assembling heavy objects has tended to be handled by workers who are capable of physical labors. Lately, we have been receiving many inquiries from customers who are attempting to improve such present situations.